Below you will find details of some of our current and historic projects. These encompass our Transformer Barriers, Archival Vaults, Blast Walls, Floors and Ceilings. Our systems use Kemwell Thermal FBI Board, a tried and tested fire protection material that has been extensively used throughout the world in the Nuclear and Power Generation Industries, as well as Transportation Infrastructure and Commercial Construction. Whatever your fire protection needs, Critical Systems and FBI Board will be able to meet and exceed your expectations.
Our Projects
Tennessee Valley Authority - Pine Ridge Substation
See pictures of our most recent Fire Barrier design, build and installation project --the install is scheduled for May 2018 - STAY TUNED FOR COMING ATTRACTIONS!
Exelon Byron Station - UNIT 2
See pictures of our recent Modular Fire & Blast Barrier System designed, fabricated and installed during the MPT Transformer Replacement Project B2R20 at Byron Station U2 this past Fall 2017.
Exelon Three Mile Island - UNIT 1
See pictures of our MFBBS installation at TMI this past Fall 2016 -- STAY TUNED FOR COMING ATTRACTIONS!
Exelon Braidwood Station - UNIT 1
See pictures of one of our recent nuclear projects -- extension of the existing Fire Separation Barriers to accommodate the New Main Power Transformers at BRW U1 during the Fall Outage 2016.
NPPD - Cooper Nuclear Station
See pictures of one of our recent nuclear projects -- design, build and install of our MFBBS separation barriers to support Cooper Nuclear Station's New SSST Transformer Replacement Upgrade - Fall 2016.
TVA - Widows Creek Substation
See pictures of one of our recent barrier projects -- design, build and install four (4) MFBBS separation barriers [27'-7" high x 39'-5" long] to support the Bank 17 Addition in Stevenson, Alabama - March 2016.
Exelon Byron Station - UNIT 1
See pictures of one of our recent nuclear projects -- extension of the existing Fire Separation Barriers to accommodate the New Main Power Transformers at BYR U1 during the Fall Outage 2015.
Exelon Limerick - UNIT 1
See pictures of one of our latest nuclear installations during Exelon's MPT Replacement Project at Unit 1 in the Spring 2014. Our new 3-D Space
Frame custom design allowed for another expeditious and safe install!
ARIZONA PUBLIC SERVICE - PALO VERDE NGS - UNITS 1, 2 & 3
See pictures of one of our recent nuclear projects -- the design, build and supply of our MFBBS to support Arizona Public Service and their Generator Excitation System PPT Project - Fall 2013.
SOUTHERN CALIFORNIA EDISON - SONGS
We prepared the Engineering Calculation --utilizing Computational Fluid Dynamics to simulate high-energy debris impacts and blast overpressure effects resulting from an exploding transformer - Summer 2013.
DUKE ENERGY - H. B. Robinson Nuclear Plant
See pictures of one of our recent nuclear projects -- design, build and install of our MFBBS separation barriers to accommodate RNP's New 230kV SUT Transformer Upgrade Project - Summer 2013.
NPPD - Cooper Nuclear - RE27
See pictures of our most recent nuclear installation during Nebraska Power's MPT Transformer Replacement Project at Cooper Nuclear Station - Fall 2012.
Exelon Braidwood Station - UNIT 2
See pictures of one of our recent nuclear projects -- extension of the existing Fire Separation Barriers during 2R15 to accommodate New 820MVA Main Power Transformers at Unit 2 - Fall 2012.
Exelon Limerick - 2R11
See pictures of one of our latest nuclear installations during Exelon's T-3
MPT Replacement Project at Unit 2 in April of 2011. Our new 3-D Space
Frame design allowed for a safe install - (4) shifts ahead of schedule!
Progress Energy RNP - RO26
See pictures of our recent nuclear installation during Robinson's MPT Replacement Project in April / May of 2010. Our 12+ month
continuous site presence was required to assist the plant in (27) E.C. Revisions.
Noranda Aluminum
See pictures of our barrier installation at Noranda Aluminum's primary aluminum smelter in New Madrid, Missouri in August 2009.
Progress Energy CR3 - Crystal River
See pictures of our nuclear installation during Crystal River's GSU Transformer Replacement Project in November 2007.
Pullman Power - Aberdeen Ceiling and Elevator Enclosure
See pictures of our Fire-Rated Ceiling and Elevator Enclosure installation inside an 100 foot diameter smoke stack located at Dayton Power & Light in August 2007.
Crown
Records Mgt
Details of our latest Vault Project with Crown RMMS in Los Angeles
Clients
Southern Company Services
AREVA
Alabama Power
Georgia Power
Gulf States Power
Progress Energy
Exelon Generation Company
Southern Company Nuclear
Duke Energy
City of Manassas
Luminant
Power Systems Development
URS - Marathon Petroleum
Nebraska Public Power District
Southern California Edison
Pacific Gas & Electric Company
Centerpoint Energy
Crown RMMS
Pullman Power
TVA
ABB